Overview
The proposed project would expand the infrastructure and power production capacity on Pine Creek from 2.1 MW to approximately 10 MW. The additional energy generated would be exported entirely to Yukon to meet a shortfall in clean energy production needs in the
territory in winter. To accomplish this increase in production, the storage range of the reservoir (Surprise Lake) will be increased by 0.9 m, and two new powerhouses will be developed using the controlled flows of Pine Creek.